Hanging drywall can be a tricky thing to do without some basic principles on how to do it easily.

Abstract to the article:

  • Starting putting up drywall with the correct layout;
  • How to attach the first wall to the studs;
  • Measure and trim the drywall;
  • Making cutouts for obstructions;
  • The proper way to hang drywall around windows and doors openings;
  • Hanging the lower panels.

How to install drywall: a tip-top guide for the beginner

how to install drywall

We decided to make this guide about sheetrocking a room because we have already done this before and what’s why we know how hard it can be. Without any useless info let’s rock&roll!

Proper Drywall Installation Starting Up with Correct Layout

What is the primary thing to do? To originate our drywall installation steps it should be mentioned at first about marking on the ground and ceiling the position of the upright studs made by a simple pencil.

We can advise you to start installing drywall panels in one top corner horizontally rather than vertically. Do it with the topmost edge opposite the ceiling. Usually, rookies try to do it in a perpendicular way but now you can think on two steps forward.

How to Attach the First Wall to the Studs?

The next thing you should know about is how to connect the first panel to the studs. For performing this part you should begin with attachment by driving nails on the edges and down the panel’s center to carry on in position opposite the studs. Make sure that you have driven enough the nails (they shouldn’t break the paper material but stand tight in it). If you have failed and the paper surface is damaged it will cause the loss of intensity to the joint.

Correct Way to Hang Drywall by Measuring and Trimming the Drywall

You will need to count down the length between the first drywall panel which is connected and the edge of the wall.

The simplest way to trim a drywall panel is to size the front part of it with a service knife and with the assistance of T-square. After this, you may close the panel away from the marked line.

You can easily score the backside of the drywall by the panel bent reversed at an angle along with the fold.

Making Cutouts for Obstructions

Going forth to the fourth step. The next part of installing sheetrock walls is to make cutouts around switches and outlets. Just measure those points to mark out locations for cutting. It would be nice if you use colorful chalk to don’t mess up such an easy step.

Putting Up Drywall Around Windows and Doors Openings

The doors should be notched to fit in the place where drywall panels fit around door openings and windows. Don’t forget to use all of the nails that are required for correct installation.

Hanging the Lower Panels

Start sheetrock installation from the bottom row of panels. To estimate the perpendicular seams from the top row to the bottom go the counter side of the room’s corner. Most probably you will need a foot-operated wallboard lift because the general length there drywall’s vertical seams should be installed minimum at the 4 feet.

Do you need to hire a crew to make a drywall installation?

putting up drywall

Basically, the drywall hanging crew consists of two professionals. It’s quite to do this on your own so if you don’t want to hire somebody you should ask one of your friends or family members to help you run on the whole of these things. You will win in both cases: it would funnier and quicker to do installing with somebody; you will save extra money for something else.

What did you learn from the article?

An easy way to check yourself is to read some conclusions for the article. The best way to install sheetrock is to follow our guide consisting of the following tricks and steps:

  1. Mark on the ground and ceiling on the arrangement of the vertical studs by the usage of a pencil;
  2. Start placing drywall hangings in one top corner horizontally (make it with the top edge opposite the ceiling;
  3. To attach the first panel to the studs by driving nails on the ends and down the panel’s center to hold it in place against the studs;
  4. Measure and trim the drywall;
  5. Create cutouts for electrical cases and other impediments;
  6. Hang the drywall around openings and windows (doors should be notched to fit in the place);
  7. Hang the bottom row of panels in the way as we advise you on the 6th step;
  8. You don’t need a professional drywall hanging crew to perform proper drywall installation. Call to help one of your friends, neighbors, or relatives!

Try to follow our guidelines in order to be a successful installation of drywall. And don’t be shy to write on somewhere the main thoughts of this easy step-by-step tutorial.

You are ready!

On this optimistic note, our collection of drywall installation tips ends! You are in 99% ready to do the work done! Remember that we have other interesting and useful guides and tutorials worth reading for.